Šolski center Slovenj Gradec
As part of the renovation, we replaced 187 external windows, installed more than 900 m² of external joinery, renovated approximately 2,900 m² of façade surfaces and refurbished around 2,930 m² of flat roofs. Inside the building, we installed 3,923 m² of new synthetic floor coverings and installed or replaced 90 door systems, more than 30 of which are fire-resistant.
An important part of the project was also the modernisation of the technical systems and the improvement of the building’s energy efficiency. We installed a 39.6 kWp solar power plant with 88 solar panels, fitted more than 700 energy-efficient LED, emergency and directional lights, and installed four central ventilation units with a total nominal airflow of 33,000 m³/h. To improve accessibility, we also installed a new passenger lift for eight people, connecting three floors of the building.
A particular challenge of the project was carrying out extensive construction and renovation works while the educational process continued at the same time. This required precise planning, phased organisation of the works and close coordination with the management of the School Centre, allowing classes to continue without interruption throughout the renovation.
The implemented measures significantly improved the building’s energy efficiency, fire safety, accessibility and functionality, while providing more modern, safer and higher-quality conditions for education.